From brief to keys.

Five stages, one team, around eighteen months. A partner leads every stage.

An architect and clients on a coastal site with a tablet
012–4 weeks

Site and brief

We visit the site with you, survey it and talk about how you want to live. Then we agree a written brief, a budget and a timeline.

  • Site visit and surveyWeek 1
  • Brief, budget and timelineWeek 2–3
  • Fee proposalWeek 4
An architect pinning drawings to a studio wall
026 weeks

Concept

We test massing and plans until the house fits the site, the climate and your day. You see three options and we choose one together.

  • Massing studiesWeek 5–6
  • Three plan optionsWeek 7–8
  • Chosen conceptWeek 10
Hands placing a wall on a white architectural model
034 weeks

Model and detail

A 1:50 model, real material samples and the key details. This is when the house becomes something you can hold.

  • 1:50 modelWeek 11–12
  • Material samples on siteWeek 13
  • Detail designWeek 14
A builder removing formwork from a concrete wall
0440–60 weeks

Construction

Permits, tender and construction. We are on site every week with the builder and send you a short report every Friday.

  • Permits and tenderMonth 4–6
  • Weekly site visitsMonth 7–18
  • Friday reportsEvery week
A key handed over at a glass front door
05One day

Handover

Keys, a full set of drawings and a maintenance guide. We come back after one year to check everything and fix what needs fixing.

  • Handover and keysMonth 18
  • Drawings and guideMonth 18
  • One-year visitMonth 30